Select Page

Ship Implementation Plan for Sulfur Compliance

A Plan to provide guidance for the actions to be taken in order to comply with the requirement sulfur content limit of 0.50% by 1st January 2020.

Regulatory Reference: IMO MEPC 73 MEPC1.Circ.878, MARPOL Annex VI Reg. 14

Regulatory Reference

Background

In line with the requirements of the latest MEPC.1/Circ.878 all ships need to be provided with a Ship Implementation Plan for the Consistent implementation of the 0.50% sulfur limit under MARPOL Annex VI. Scope of the Plan is to provide guidance for the actions to be taken in order to comply with the requirement sulfur content limit of 0.50% by 1st January 2020. Approval by the Administration or a Recognised Organisation (RO) on behalf of the Administration is NOT mandatory.

Indicative Contents :

Plan will cover the requirements of IMO MEPC.1 /Circ.878

  • SIP – 01: System Configuration
  • SIP – 02: Tank Designation
  • SIP – 03: Procurement
  • SIP – 04: Change Over Plan
  • SIP – 05: Documentation and Reporting

Info/Plans Required

  • Ship Specific Information (Questionnaire to be submitted)

Benefits

  • Master and Chief Engineer will have a guidance with respect to Vessel’s preparation for compliance with new sulfur limit
  • Procedures as per vessel specific equipment and construction
  • Easy record keeping

We will Ensure

  • Full compliance with national and international regulations and common marine practice
  • Real life documentation addressed to senior officers and crew onboard
  • Full integration of any client specific requirements
  • Full support provided after development in line with our Document Support Policy

Request Info

 

Related Solutions


250€ 225€

COLOR PAPER

450€ 405€

EDITABLE MS WORD